Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
530
matching recommendationsNAICS | 326113 | Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0071 # 02 Y:2011 | 02 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $650 | $0 | Implemented |
DL0071 # 03 Y:2011 | 03 | 2011 | REDUCE VENTILATION AIR | $4,520 | $0 | Implemented |
DL0071 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,600 | $5,300 | Not Implemented |
DL0071 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,970 | $2,390 | Not Implemented |
DL0071 # 06 Y:2011 | 06 | 2011 | INSULATE BARE EQUIPMENT | $430 | $180 | Not Implemented |
DL0071 # 07 Y:2011 | 07 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $710 | $100 | Implemented |
DL0071 # 08 Y:2011 | 08 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $590 | $2,484 | Implemented |
DL0071 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $1,800 | Not Implemented |
DL0071 # 10 Y:2011 | 10 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,668 | $2,500 | Implemented |
DL0071 # 11 Y:2011 | 11 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,960 | $4,000 | Implemented |
LE0317 # 01 Y:2011 | 01 | 2011 | REPLACE BOILER | $284,580 | $500,000 | Implemented |
LE0317 # 02 Y:2011 | 02 | 2011 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $185,253 | $118,000 | Implemented |
LE0317 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,617 | $13,469 | Implemented |
LE0317 # 04 Y:2011 | 04 | 2011 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $28,496 | $10,000 | Not Implemented |
LE0317 # 05 Y:2011 | 05 | 2011 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $24,299 | $75,000 | Not Implemented |
LE0317 # 06 Y:2011 | 06 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $23,321 | $4,200 | Implemented |
LE0317 # 07 Y:2011 | 07 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,721 | $22,000 | Implemented |
LE0317 # 08 Y:2011 | 08 | 2011 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,375 | $100,000 | Implemented |
LE0317 # 09 Y:2011 | 09 | 2011 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $8,387 | $8,000 | Implemented |
LE0317 # 10 Y:2011 | 10 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,358 | $870 | Implemented |
LE0317 # 11 Y:2011 | 11 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,938 | $3,000 | Implemented |
LE0317 # 12 Y:2011 | 12 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,001 | $4,500 | Not Implemented |
LE0317 # 13 Y:2011 | 13 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,553 | $2,440 | Implemented |
LE0317 # 14 Y:2011 | 14 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,029 | $20,000 | Not Implemented |
LE0317 # 15 Y:2011 | 15 | 2011 | INSTALL OCCUPANCY SENSORS | $1,097 | $2,035 | Implemented |