IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

530

matching recommendations
Reset
NAICS 326113 Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0267 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,665 $30 Not Implemented
LL0267 # 03 Y:2007 03 2007 USE PHOTOCELL CONTROLS $3,379 $360 Not Implemented
LL0267 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,794 $1,280 Implemented
LL0267 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $553 $180 Not Implemented
LL0267 # 06 Y:2007 06 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $155 $319 Not Implemented
LL0267 # 07 Y:2007 07 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $142 $303 Not Implemented
LL0267 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $140 Not Implemented
LL0267 # 09 Y:2007 09 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,060 $2,034 Not Implemented
MA0609 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,854 $54,000 Not Implemented
MA0609 # 02 Y:2007 02 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $11,356 $40,000 Not Implemented
MA0609 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,050 $5,000 Not Implemented
MA0609 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,398 $19,100 Not Implemented
MA0609 # 05 Y:2007 05 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,871 $7,500 Not Implemented
MA0609 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,436 $2,200 Not Implemented
MA0609 # 07 Y:2007 07 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,227 $3,200 Not Implemented
MA0609 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,158 $300 Not Implemented
MA0609 # 09 Y:2007 09 2007 INSULATE BARE EQUIPMENT $849 $600 Not Implemented
MA0609 # 10 Y:2007 10 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $652 $0 Not Implemented
WV0340 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $80,134 $2,500 Implemented
WV0340 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $42,375 $27,500 Implemented
WV0340 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,539 $29,343 Not Implemented
WV0340 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $8,729 $2,605 Implemented
WV0340 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,797 $1,520 Not Implemented
WV0340 # 06 Y:2006 06 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,647 $6,520 Not Implemented
WV0340 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $3,001 $90 Implemented