Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
522
matching recommendationsNAICS | 326113 | Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0406 # 07 Y:2022 | 07 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,016 | $100 | Not Implemented |
LE0488 # 01 Y:2020 | 01 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $1,217 | $40 | Not Implemented |
LE0488 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,201 | $360 | Implemented |
LE0488 # 03 Y:2020 | 03 | 2020 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $82,690 | $150,334 | Implemented |
LE0488 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,465 | $13,000 | Implemented |
LE0488 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,995 | $12,420 | Implemented |
LE0488 # 06 Y:2020 | 06 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $788 | $2,200 | Implemented |
LE0488 # 07 Y:2020 | 07 | 2020 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,905 | $9,300 | Implemented |
UD1009 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $32,116 | $0 | Implemented |
UD1009 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,826 | $1,000 | Implemented |
UD1009 # 03 Y:2020 | 03 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $78,282 | $44,250 | Not Implemented |
UD1009 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,717 | $4,388 | Implemented |
UD1009 # 05 Y:2020 | 05 | 2020 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $107,302 | $83,000 | Implemented |
UD1009 # 06 Y:2020 | 06 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $100,517 | $151,300 | Not Implemented |
UD1009 # 07 Y:2020 | 07 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $73,844 | $147,736 | Not Implemented |
OK1017 # 01 Y:2019 | 01 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,604 | $17,500 | Not Implemented |
OK1017 # 02 Y:2019 | 02 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,627 | $231 | Not Implemented |
OK1017 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,220 | $22,288 | Not Implemented |
OK1017 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,214 | $3,590 | Not Implemented |
OK1017 # 05 Y:2019 | 05 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,164 | $0 | Not Implemented |
AM0776 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $46,030 | $25,900 | Not Implemented |
AM0776 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,200 | $60,000 | Implemented |
AM0776 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,400 | $2,000 | Implemented |
AM0776 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,155 | $38 | Implemented |
AM0776 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,244 | $0 | Implemented |