Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 326113 | Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1071 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,651 | $1,800 | Implemented |
UD1071 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,777 | $1,275 | Not Implemented |
UD1071 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,375 | $11,280 | Implemented |
UD1071 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,111 | $952 | Implemented |
UD1071 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,691 | $0 | Not Implemented |
UD1071 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $60,417 | $127,158 | Not Implemented |
UD1055 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,013 | $2,835 | Not Implemented |
UD1055 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,617 | $4,189 | Not Implemented |
UD1055 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $4,478 | $2,800 | Not Implemented |
UD1055 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $499 | $675 | Not Implemented |
UD1055 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $716 | $0 | Implemented |
UD1055 # 03 Y:2023 | 03 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $4,980 | $600 | Not Implemented |
UD1055 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,342 | $952 | Not Implemented |
UD1055 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $109,446 | $0 | Not Implemented |
UD1055 # 09 Y:2023 | 09 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $8,276 | $296 | Not Implemented |
UD1055 # 10 Y:2023 | 10 | 2023 | OPTIMIZE PLANT POWER FACTOR | $13,546 | $36,036 | Not Implemented |
UD1054 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $933 | $7,594 | Implemented |
UD1054 # 09 Y:2023 | 09 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,823 | $44,209 | Implemented |
UD1054 # 07 Y:2023 | 07 | 2023 | DISCONNECT BALLASTS | $172 | $240 | Implemented |
UD1054 # 11 Y:2023 | 11 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,768,755 | $300,000 | Not Implemented |
UD1054 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,142 | $9,668 | Implemented |
UD1054 # 05 Y:2023 | 05 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $11,624 | $1,500 | Implemented |
UD1054 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $242 | $500 | Not Implemented |
UD1054 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $310 | $0 | Not Implemented |
UD1054 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,248 | $500 | Implemented |