Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsNAICS | 32612 | Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0596 # 13 Y:2020 | 13 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $60 | Implemented |
WV0596 # 16 Y:2020 | 16 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $326 | $1,500 | Implemented |
WV0596 # 01 Y:2020 | 01 | 2020 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $103,798 | $40,718 | Implemented |
WV0596 # 02 Y:2020 | 02 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,186 | $20,034 | Implemented |
WV0596 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,729 | $1,600 | Implemented |
WV0596 # 04 Y:2020 | 04 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,964 | $30 | Not Implemented |
WV0596 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $7,560 | $7,967 | Implemented |
WV0596 # 08 Y:2020 | 08 | 2020 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $3,333 | $14,200 | Not Implemented |
WV0596 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,079 | $10,000 | Implemented |
WV0596 # 17 Y:2020 | 17 | 2020 | INSULATE BARE EQUIPMENT | $308 | $85 | Not Implemented |
WV0596 # 15 Y:2020 | 15 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $507 | $700 | Implemented |
WV0596 # 11 Y:2020 | 11 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $1,750 | $372 | Implemented |
WV0596 # 12 Y:2020 | 12 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,108 | $1,828 | Implemented |
WV0596 # 14 Y:2020 | 14 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $626 | $4,034 | Implemented |
WV0596 # 10 Y:2020 | 10 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,829 | $0 | Not Implemented |
WV0596 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $6,754 | $7,949 | Implemented |
WV0596 # 09 Y:2020 | 09 | 2020 | INSULATE BARE EQUIPMENT | $2,311 | $1,566 | Implemented |
UD1005 # 02 Y:2019 | 02 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,649 | $700 | Not Implemented |
UD1005 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,162 | $50 | Not Implemented |
UD1005 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,555 | $0 | Not Implemented |
UD1005 # 03 Y:2019 | 03 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,736 | $12,025 | Not Implemented |
WV0529 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $234 | $90 | Implemented |
WV0529 # 06 Y:2016 | 06 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $624 | $1,090 | Not Implemented |
WV0529 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,370 | $980 | Not Implemented |
WV0529 # 09 Y:2016 | 09 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $83 | $168 | Implemented |