IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0492 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $10,912 $4,050 n/a
BD0492 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,166 $21,060 n/a
BD0492 # 11 Y:2016 11 2016 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $225 $200 n/a
BD0492 # 10 Y:2016 10 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $285 $200 n/a
BD0492 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $485 $1,200 n/a
BD0492 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $529 $75 n/a
BD0492 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $476 $600 n/a
BD0492 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,039 $20 n/a
BD0492 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $6,032 n/a
BD0492 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,305 $500 n/a
BD0492 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,352 $2,600 n/a
OK0947 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,871 $92,000 Not Implemented
OK0947 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $985 $3,780 Not Implemented
OK0947 # 06 Y:2016 06 2016 INSTALL SET-BACK TIMERS $483 $410 Not Implemented
OK0947 # 07 Y:2016 07 2016 OPTIMIZE PLANT POWER FACTOR $4,680 $27,500 Not Implemented
OK0947 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,495 $9,720 Not Implemented
OK0947 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $11,683 $10,036 Not Implemented
OK0947 # 05 Y:2016 05 2016 USE RADIANT HEATER FOR SPOT HEATING $3,754 $19,570 Not Implemented
OK0947 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $368 $822 Not Implemented
OK0947 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,092 $2,000 Not Implemented
OK0947 # 10 Y:2016 10 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $362 $540 Not Implemented
WV0529 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,370 $980 Not Implemented
WV0529 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $3,852 $1,833 Not Implemented
WV0529 # 03 Y:2016 03 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,056 $1,000 Not Implemented
WV0529 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $993 $125 Implemented