IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0653 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $91,923 $0 n/a
SD0653 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $121,184 $170,933 n/a
SD0653 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $50,979 $44,800 n/a
SD0653 # 11 Y:2024 11 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $275 $157 n/a
SD0653 # 10 Y:2024 10 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,544 $64,866 n/a
SD0653 # 09 Y:2024 09 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,105 $27,075 n/a
SD0653 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $751 $500 n/a
SD0653 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,867 $3,608 n/a
SD0653 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $995 $2,202 n/a
SD0653 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,223 $1,822 n/a
SD0653 # 04 Y:2024 04 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $3,133 $8,720 n/a
SD0653 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,208 $1,590 n/a
SF0447 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $2,240 $6,743 Not Implemented
SF0447 # 04 Y:2014 04 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,158 $105,000 Not Implemented
SF0447 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,366 $4,235 Implemented
SF0447 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,248 $0 Implemented
SF0447 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,814 $70 Not Implemented
SF0447 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,962 $93,924 Not Implemented
SF0447 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,341 $15,131 Not Implemented
SF0447 # 08 Y:2014 08 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $139,124 $745,024 Not Implemented
SF0345 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $511 $1,404 Not Implemented
SF0345 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,999 $3,759 Implemented
SF0345 # 04 Y:2007 04 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,019 $711 Not Implemented
SF0345 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,919 $5,140 Not Implemented
SF0345 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,951 $2,939 Not Implemented