IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
NAICS 326122 Plastics Pipe and Pipe Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0121 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,015 $964 Implemented
MS0270 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $207,595 $1,008,706 Implemented
MS0270 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,478 $89,204 Implemented
MS0270 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,299 $0 Implemented
MS0270 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,451 $228 Implemented
MS0270 # 07 Y:2005 07 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $877 $0 Implemented
LL0206 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $28,231 $3,647 Implemented
LL0206 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,510 $8,280 Implemented
LL0206 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,379 $30 Implemented
LL0206 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $620 $525 Implemented
LL0206 # 07 Y:2004 07 2004 USE PHOTOCELL CONTROLS $323 $90 Implemented
LL0206 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $160 $150 Implemented
LL0206 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $181 $150 Implemented
LL0206 # 10 Y:2004 10 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $114,500 $4,820 Implemented
LL0206 # 11 Y:2004 11 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,830 $1,790 Implemented
GT0781 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $77 $0 Implemented
GT0781 # 02 Y:2004 02 2004 USE POWER DURING OFF-PEAK PERIODS $580 $450 Implemented
GT0781 # 03 Y:2004 03 2004 DISCONNECT BALLASTS $4,110 $2,750 Implemented
GT0781 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $740 $1,000 Implemented
GT0781 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $7,300 Implemented
MS0249 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $54,067 $26,100 Implemented
MS0249 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $19,536 $250 Implemented
MS0249 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,879 $708 Implemented
MS0249 # 11 Y:2004 11 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $488 $820 Implemented
LL0181 # 01 Y:2004 01 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,934 $395 Implemented