IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

440

matching recommendations
Reset
NAICS 326122 Plastics Pipe and Pipe Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0855 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,628 $22,407 Implemented
OK0855 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,455 $8,640 Not Implemented
OK0855 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,606 $3,000 Implemented
OK0855 # 13 Y:2013 13 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,337 $2,676 Not Implemented
OK0855 # 14 Y:2013 14 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,571 $3,850 Not Implemented
OK0855 # 15 Y:2013 15 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,950 $1,220 Not Implemented
OK0855 # 16 Y:2013 16 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,059 $54,000 Not Implemented
OK0855 # 17 Y:2013 17 2013 INSULATE BARE EQUIPMENT $7,673 $1,199 Not Implemented
OK0855 # 18 Y:2013 18 2013 INSULATE BARE EQUIPMENT $258 $960 Not Implemented
OK0855 # 19 Y:2013 19 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,292 $6,796 Not Implemented
OK0855 # 20 Y:2013 20 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,823 $3,063 Not Implemented
OK0855 # 21 Y:2013 21 2013 OPTIMIZE PLANT POWER FACTOR $17,798 $13,508 Implemented
WV0460 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,183 $0 Implemented
WV0460 # 02 Y:2013 02 2013 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $14,224 $1,000 Implemented
WV0460 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,833 $27,115 Not Implemented
WV0460 # 04 Y:2013 04 2013 DEVELOP A REPAIR/REPLACE POLICY $7,221 $553 Implemented
WV0460 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $6,230 $2,734 Not Implemented
WV0460 # 06 Y:2013 06 2013 INSTALL TIMERS AND/OR THERMOSTATS $2,480 $2,088 Not Implemented
WV0460 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,232 $18 Implemented
WV0460 # 08 Y:2013 08 2013 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,354 $6,500 Not Implemented
WV0460 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $936 $10,030 Implemented
WV0460 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $1,725 Implemented
WV0460 # 11 Y:2013 11 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $737 $829 Implemented
UD0844 # 01 Y:2011 01 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $170,257 $280,000 Not Implemented
UD0844 # 02 Y:2011 02 2011 USE REACTIVE RINSING $70,989 $30,000 Not Implemented