IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

440

matching recommendations
Reset
NAICS 326122 Plastics Pipe and Pipe Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1065 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,263 $0 Implemented
OK1065 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,433 $2,429 Implemented
OK1065 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,273 $21,539 Implemented
OK1057 # 01 Y:2021 01 2021 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $10,601 $1,701 Implemented
OK1057 # 02 Y:2021 02 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,483 $56,000 Implemented
OK1057 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $533 $1,400 Not Implemented
OK1057 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,960 $0 Implemented
SF0575 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,624 $18,284 Implemented
SF0575 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $100 Not Implemented
SF0575 # 02 Y:2021 02 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,510 $0 Not Implemented
SF0575 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,526 $0 Not Implemented
SF0575 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,084 $0 Implemented
SF0575 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,642 $1,513 Implemented
SF0575 # 09 Y:2021 09 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,137 $1,513 Implemented
SF0575 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,559 $16,052 Implemented
SF0575 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,748 $1,047 Implemented
SF0575 # 06 Y:2021 06 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,311 $966 Implemented
SF0575 # 11 Y:2021 11 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,353 $19,986 Implemented
SF0575 # 12 Y:2021 12 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,554 $6,764 Implemented
CO0741 # 07 Y:2021 07 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $51,454 $3,624 Implemented
CO0741 # 08 Y:2021 08 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,987 $33,250 Not Implemented
CO0741 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,303 $3,500 Implemented
CO0741 # 04 Y:2021 04 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,264 $21,000 Implemented
CO0741 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,984 $0 Implemented
CO0741 # 02 Y:2021 02 2021 INSTALL WIND POWERED ELECTRIC GENERATOR $38,875 $547,800 Not Implemented