Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 326122 | Plastics Pipe and Pipe Fitting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0596 # 11 Y:2020 | 11 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $1,750 | $372 | Implemented |
WV0596 # 02 Y:2020 | 02 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,186 | $20,034 | Implemented |
WV0596 # 01 Y:2020 | 01 | 2020 | ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING | $103,798 | $40,718 | Implemented |
WV0596 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $7,560 | $7,967 | Implemented |
WV0596 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,079 | $10,000 | Implemented |
WV0596 # 15 Y:2020 | 15 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $507 | $700 | Implemented |
WV0596 # 17 Y:2020 | 17 | 2020 | INSULATE BARE EQUIPMENT | $308 | $85 | Not Implemented |
WV0596 # 12 Y:2020 | 12 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,108 | $1,828 | Implemented |
WV0596 # 04 Y:2020 | 04 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,964 | $30 | Not Implemented |
WV0596 # 10 Y:2020 | 10 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,829 | $0 | Not Implemented |
WV0596 # 13 Y:2020 | 13 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $60 | Implemented |
WV0596 # 09 Y:2020 | 09 | 2020 | INSULATE BARE EQUIPMENT | $2,311 | $1,566 | Implemented |
WV0596 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,729 | $1,600 | Implemented |
WV0596 # 16 Y:2020 | 16 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $326 | $1,500 | Implemented |
WV0596 # 14 Y:2020 | 14 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $626 | $4,034 | Implemented |
WV0596 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $6,754 | $7,949 | Implemented |
WV0596 # 08 Y:2020 | 08 | 2020 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $3,333 | $14,200 | Not Implemented |
WV0529 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $3,852 | $1,833 | Not Implemented |
WV0529 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,370 | $980 | Not Implemented |
WV0529 # 03 Y:2016 | 03 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,056 | $1,000 | Not Implemented |
WV0529 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $993 | $125 | Implemented |
WV0529 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $651 | $1,922 | Implemented |
WV0529 # 06 Y:2016 | 06 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $624 | $1,090 | Not Implemented |
WV0529 # 07 Y:2016 | 07 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $498 | $585 | Implemented |
WV0529 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $234 | $90 | Implemented |