Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 326122 | Plastics Pipe and Pipe Fitting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1055 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,454 | $1,872 | Not Implemented |
OK1055 # 01 Y:2021 | 01 | 2021 | INCREASE USE OF AUTOMATION | $444,132 | $165,066 | Not Implemented |
OK1055 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,169 | $0 | Not Implemented |
OK1055 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,307 | $26,424 | Not Implemented |
OK1055 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,704 | $1,561 | Not Implemented |
AM0796 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $590 | $86 | Not Implemented |
AM0796 # 07 Y:2020 | 07 | 2020 | INSTALL OCCUPANCY SENSORS | $830 | $150 | Not Implemented |
AM0796 # 06 Y:2020 | 06 | 2020 | USE SYNTHETIC LUBRICANT | $1,230 | $200 | Not Implemented |
AM0796 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,880 | $3,720 | Not Implemented |
AM0796 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,300 | $11,500 | Not Implemented |
AM0796 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $20,000 | $47,510 | Not Implemented |
AM0796 # 01 Y:2020 | 01 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $163,700 | $7,500 | Not Implemented |
AM0796 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,470 | $30 | Not Implemented |
OK0902 # 12 Y:2015 | 12 | 2015 | INSULATE BARE EQUIPMENT | $44,461 | $58,968 | Implemented |
OK0902 # 11 Y:2015 | 11 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $904 | $520 | Implemented |
OK0902 # 10 Y:2015 | 10 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $524 | $1,220 | Not Implemented |
OK0902 # 09 Y:2015 | 09 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $441 | $1,262 | Not Implemented |
OK0902 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $316 | $329 | Not Implemented |
OK0902 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,028 | $3,948 | Not Implemented |
OK0902 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,781 | $8,612 | Not Implemented |
OK0902 # 05 Y:2015 | 05 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $1,358 | $3,750 | Not Implemented |
OK0902 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,160 | $2,367 | Not Implemented |
OK0902 # 03 Y:2015 | 03 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,033 | $14,760 | Not Implemented |
OK0902 # 02 Y:2015 | 02 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $739 | $468 | Implemented |
OK0902 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,929 | $24,297 | Not Implemented |