Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
31
matching recommendationsNAICS | 326122 | Plastics Pipe and Pipe Fitting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0290 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,200 | $500 | n/a |
UA0290 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,530 | $5,091 | n/a |
UA0290 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,760 | $8,397 | n/a |
UA0290 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,137 | $2,005 | n/a |
UA0290 # 06 Y:2024 | 06 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $10,563 | $56,271 | n/a |
UA0290 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $224 | $224 | n/a |
UA0290 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $348 | $452 | n/a |
UA0290 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $81,410 | $555,652 | n/a |
UF0622 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $43,371 | $52,879 | n/a |
UF0622 # 12 Y:2024 | 12 | 2024 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $3,200 | $3,200 | n/a |
UF0622 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $13,853 | $3,888 | n/a |
UF0622 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,345 | $12,420 | n/a |
UF0622 # 05 Y:2024 | 05 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $10,345 | $46,500 | n/a |
UF0622 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,789 | $25,360 | n/a |
UF0622 # 07 Y:2024 | 07 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $5,875 | $6,148 | n/a |
UF0622 # 08 Y:2024 | 08 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,035 | $0 | n/a |
UF0622 # 09 Y:2024 | 09 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $16,512 | $11,225 | n/a |
UF0622 # 10 Y:2024 | 10 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $46,005 | $0 | n/a |
UF0622 # 11 Y:2024 | 11 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $30,240 | $788 | n/a |
UF0622 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,219 | $322,608 | n/a |
UF0615 # 11 Y:2024 | 11 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $20,106 | $3,020 | Implemented |
UF0615 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,769 | $2,352 | Implemented |
UF0615 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $2,456 | $4,000 | Implemented |
UF0615 # 08 Y:2024 | 08 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,975 | $10,830 | Not Implemented |
UF0615 # 07 Y:2024 | 07 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $8,021 | $5,898 | Implemented |