IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

185

matching recommendations
Reset
NAICS 32613 Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0223 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $210 $24 Not Implemented
IC0223 # 04 Y:2019 04 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $550 $0 Implemented
IC0223 # 03 Y:2019 03 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $264 $0 Not Implemented
IC0223 # 02 Y:2019 02 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $267 $2,000 Not Implemented
IC0222 # 03 Y:2019 03 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $524 $0 Not Implemented
IC0222 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $320 Not Implemented
IC0222 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,363 $2,231 Implemented
IP0044 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $269 $520 Not Implemented
IP0044 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,489 $10,430 Not Implemented
IP0044 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $145 $57 Not Implemented
IP0044 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,267 $486 Not Implemented
IP0044 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,883 $78 Implemented
DL0132 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,030 $14,000 Implemented
DL0132 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,820 $17,500 Not Implemented
DL0132 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,480 $1,375 Implemented
DL0132 # 03 Y:2014 03 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,657 $2,600 Not Implemented
DL0132 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $11,450 $1,000 Implemented
DL0132 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,000 $3,000 Not Implemented
DL0132 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,800 $4,000 Not Implemented
DL0132 # 07 Y:2014 07 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,920 $1,000 Implemented
DL0132 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,580 $7,000 Not Implemented
DL0132 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,320 $13,455 Implemented
DL0132 # 11 Y:2014 11 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $8,380 $0 Implemented
DL0132 # 08 Y:2014 08 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,350 $1,600 Not Implemented
DL0132 # 10 Y:2014 10 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $860 $0 Implemented