IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
NAICS 32613 Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0113 # 03 Y:2013 03 2013 DISCONNECT BALLASTS $1,433 $0 Not Implemented
TT0113 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $135 $114 Not Implemented
TT0113 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $14,759 $20,200 Not Implemented
TT0113 # 06 Y:2013 06 2013 DEVELOP A REPAIR/REPLACE POLICY $21,613 $30,289 Not Implemented
TT0113 # 07 Y:2013 07 2013 UPGRADE CONTROLS ON COMPRESSORS $2,195 $5,600 Not Implemented
IA0492 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,544 $585 Implemented
IA0492 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,344 $720 Implemented
IA0492 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $755 $1,617 Implemented
IA0492 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $914 $490 Not Implemented
IA0492 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,082 $105 Not Implemented
IA0492 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,450 $590 Not Implemented
IA0492 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $35 Not Implemented
AM0615 # 01 Y:2012 01 2012 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $455,515 $1,000,000 Not Implemented
AM0615 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,021 $107,528 Not Implemented
AM0615 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,924 $900 Implemented
AM0615 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,856 $27,318 Implemented
AM0615 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $13,704 $10,754 Implemented
AM0615 # 06 Y:2012 06 2012 REPAIR OR REPLACE STEAM TRAPS $10,200 $273 Implemented
AM0615 # 07 Y:2012 07 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,909 $27,494 Implemented
AM0615 # 08 Y:2012 08 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,659 $875 Implemented
AM0615 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,788 $13 Implemented
AM0615 # 10 Y:2012 10 2012 USE SYNTHETIC LUBRICANT $760 $0 Implemented
AM0613 # 01 Y:2012 01 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,010 $38,103 Implemented
AM0613 # 02 Y:2012 02 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $16,300 $20,900 Implemented
AM0613 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $14,800 $2,230 Not Implemented