IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

231

matching recommendations
Reset
NAICS 32614 Polystyrene Foam Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0703 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,371 $2,930 Not Implemented
MA0703 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,254 $100 Implemented
MA0703 # 08 Y:2012 08 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $803 $1,200 Not Implemented
MA0703 # 09 Y:2012 09 2012 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $332 $150 Implemented
IC0187 # 01 Y:2011 01 2011 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,544 $36,000 Not Implemented
IC0187 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $189 $427 Not Implemented
IC0187 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,983 $8,704 Not Implemented
IC0187 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,487 $13,428 Not Implemented
IC0187 # 05 Y:2011 05 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $965 $3,337 Not Implemented
IC0187 # 06 Y:2011 06 2011 INSTALL TIMERS AND/OR THERMOSTATS $236 $0 Not Implemented
IC0187 # 07 Y:2011 07 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $350 $0 Not Implemented
UM0379 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,353 $14,633 Implemented
UM0379 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,706 $2,000 Implemented
UM0379 # 03 Y:2010 03 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $229 $10 Implemented
UM0379 # 04 Y:2010 04 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,060 $1,500 Implemented
UM0379 # 05 Y:2010 05 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,283 $9,861 Implemented
UM0379 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,989 $1,350 Implemented
DL0014 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $3,600 $0 Implemented
DL0014 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $470 $635 Not Implemented
DL0014 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $2,173 $4,200 Not Implemented
DL0014 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,481 $12,133 Not Implemented
DL0014 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,500 $15,000 Not Implemented
DL0014 # 06 Y:2008 06 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,200 $20,000 Not Implemented
IA0420 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,339 $900 Not Implemented
IA0420 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,062 $1,000 Not Implemented