IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 32615 Urethane and Other Foam Product (except Polystyrene) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0308 # 01 Y:2010 01 2010 INSTALL TIMERS AND/OR THERMOSTATS $21,676 $250 Implemented
LE0308 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $14,300 Not Implemented
LE0308 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,491 $7,592 Not Implemented
LE0308 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,733 $7,344 Not Implemented
LE0308 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,146 $700 Not Implemented
LE0308 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,037 $1,720 Not Implemented
LE0308 # 05 Y:2010 05 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,842 $6,180 Implemented
LE0308 # 04 Y:2010 04 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,965 $25,000 Not Implemented
LE0308 # 03 Y:2010 03 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,731 $12,600 Not Implemented
LE0308 # 02 Y:2010 02 2010 REPLACE BOILER $18,600 $210,000 Implemented
LE0209 # 01 Y:2005 01 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $669,800 $350,000 Not Implemented
LE0209 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $842 $148 Implemented
LE0209 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $886 $2,140 Implemented
LE0209 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,643 $1,000 Not Implemented
LE0209 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,464 $380 Implemented
LE0209 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,468 $2,000 Implemented
LE0209 # 04 Y:2005 04 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $10,145 $300 Not Implemented
LE0209 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $18,034 $95 Implemented
LE0209 # 02 Y:2005 02 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $200,574 $550,000 Not Implemented