IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
NAICS 32616 Plastics Bottle Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0053 # 02 Y:2020 02 2020 KEEP EQUIPMENT CLEAN $24,724 $8,528 Implemented
NL0053 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,267 $4,456 Implemented
NL0053 # 04 Y:2020 04 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,704 $12,000 Implemented
NL0053 # 05 Y:2020 05 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,360 $56 Implemented
NL0053 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,013 $1,500 Implemented
NL0053 # 08 Y:2020 08 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,080 $56 Implemented
MZ0045 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,876 $46,050 Implemented
MZ0045 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,734 $950 Implemented
MZ0045 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,645 $0 Implemented
MZ0045 # 05 Y:2009 05 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $23,660 $0 Implemented
MZ0017 # 01 Y:2008 01 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $8,697 $1,600 Implemented
MZ0017 # 03 Y:2008 03 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,980 $15,763 Implemented
IA0349 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,768 $509 Implemented
IA0349 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $726 $800 Implemented
IA0349 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,607 $2,376 Implemented
IA0349 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,067 $1,600 Implemented