Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 32616 | Plastics Bottle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0938 # 12 Y:2016 | 12 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,836 | $1,371,615 | Not Implemented |
OK0938 # 11 Y:2016 | 11 | 2016 | OPTIMIZE PLANT POWER FACTOR | $26,300 | $47,542 | Implemented |
OK0938 # 10 Y:2016 | 10 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $372,611 | $70,000 | Not Implemented |
OK0938 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $34,651 | $40,660 | Not Implemented |
OK0938 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,405 | $59,664 | Implemented |
OK0938 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,558 | $4,930 | Not Implemented |
OK0938 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,124 | $3,000 | Not Implemented |
OK0938 # 05 Y:2016 | 05 | 2016 | INSTALL SET-BACK TIMERS | $317 | $344 | Implemented |
OK0938 # 06 Y:2016 | 06 | 2016 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $5,044 | $44,525 | Not Implemented |
OK0938 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $4,491 | $2,935 | Not Implemented |
OK0938 # 08 Y:2016 | 08 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,294 | $5,000 | Not Implemented |
OK0938 # 09 Y:2016 | 09 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,693 | $3,236 | Implemented |
WM0083 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $12,261 | $1,680 | Not Implemented |
WM0083 # 01 Y:2016 | 01 | 2016 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $61,468 | $22,995 | Not Implemented |
WM0083 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $27,491 | $7,200 | Implemented |
WM0083 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $34,888 | $8,785 | Not Implemented |
WM0083 # 08 Y:2016 | 08 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $273 | $695 | Not Implemented |
WM0083 # 07 Y:2016 | 07 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,105 | $2,490 | Implemented |
WM0083 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $1,673 | $1,425 | Implemented |
WM0083 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,901 | $15,200 | Implemented |
CO0720 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $930 | $1,330 | Not Implemented |
CO0720 # 04 Y:2016 | 04 | 2016 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $5,510 | $27,600 | Not Implemented |
CO0720 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,190 | $67,155 | Implemented |
CO0720 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $300 | Implemented |
CO0720 # 01 Y:2016 | 01 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,640 | $62,670 | Not Implemented |