Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,049
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0339 # 02 Y:2025 | 02 | 2025 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $33,333 | $35,000 | n/a |
TT0339 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $49,796 | $276,634 | n/a |
TT0339 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $31,076 | $9,750 | n/a |
TT0339 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,030 | $20,000 | n/a |
TT0339 # 09 Y:2025 | 09 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $868 | $100 | n/a |
TT0339 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,575 | $11,250 | n/a |
TT0339 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,566 | $850 | n/a |
TT0339 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,876 | $5,625 | n/a |
TT0339 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,795 | $10,920 | n/a |
NT0047 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $166,705 | $320,438 | n/a |
NT0047 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $26,918 | $27,300 | n/a |
NT0047 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $87,586 | $164,542 | n/a |
NT0047 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $89,410 | $0 | n/a |
NT0047 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,099 | $4,224 | n/a |
NT0047 # 04 Y:2025 | 04 | 2025 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $61,852 | $120,692 | n/a |
NT0047 # 08 Y:2025 | 08 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $852 | $0 | n/a |
NT0047 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,083 | $1,434 | n/a |
MU0069 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $24,311 | $129,488 | n/a |
MU0069 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,682 | $5,553 | n/a |
MU0069 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,826 | $669 | n/a |
MU0069 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $339 | $581 | n/a |
MU0069 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,011 | $0 | n/a |
MU0069 # 10 Y:2025 | 10 | 2025 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $188 | $1,500 | n/a |
MU0069 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $674 | $120 | n/a |
MU0069 # 06 Y:2025 | 06 | 2025 | KEEP EQUIPMENT CLEAN | $3,684 | $0 | n/a |