Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,850
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2409 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,680 | $5,800 | n/a |
UL2409 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,092 | $975 | n/a |
UL2409 # 02 Y:2024 | 02 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $8,858 | $43,234 | n/a |
UL2409 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $52,606 | $886,307 | n/a |
UL2409 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,073 | $2,880 | n/a |
UC2410 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $187 | $0 | n/a |
UC2410 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,615 | $75 | n/a |
UC2410 # 08 Y:2024 | 08 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $185 | $0 | n/a |
UC2410 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,791 | $3,455 | n/a |
UC2410 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,168 | $100 | n/a |
UC2410 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,308 | $1,300 | n/a |
UC2410 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,516 | $0 | n/a |
UC2410 # 03 Y:2024 | 03 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $238 | $0 | n/a |
AS0583 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $137 | $172 | n/a |
AS0583 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,282 | $4,696 | n/a |
AS0583 # 07 Y:2024 | 07 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $94 | $52 | n/a |
AS0583 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $122 | $476 | n/a |
AS0583 # 03 Y:2024 | 03 | 2024 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,022 | $1,805 | n/a |
AS0583 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,396 | $642,159 | n/a |
AS0583 # 02 Y:2024 | 02 | 2024 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $43,888 | $15,124 | n/a |
IP0197 # 01 Y:2024 | 01 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $33,478 | $697 | n/a |
IP0197 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,867 | $18,107 | n/a |
IP0197 # 02 Y:2024 | 02 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,662 | $320 | n/a |
IP0197 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,000 | $1,506 | n/a |
IP0197 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,370 | $13,000 | n/a |