IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0143 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,385 $1,541 Implemented
IC0143 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,544 $1,035 Implemented
IC0143 # 08 Y:2008 08 2008 INSULATE BARE EQUIPMENT $688 $580 Not Implemented
IC0143 # 09 Y:2008 09 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,040 $37 Implemented
IC0143 # 10 Y:2008 10 2008 INSULATE BARE EQUIPMENT $50 $42 Not Implemented
IC0143 # 11 Y:2008 11 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,202 $32,361 Implemented
IC0143 # 12 Y:2008 12 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $541 $0 Implemented
IC0143 # 13 Y:2008 13 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $195 $0 Not Implemented
UD0784 # 01 Y:2008 01 2008 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $123,480 $15,500 Not Implemented
UD0784 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,375 $75,000 Not Implemented
UD0784 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $44,362 $13,500 Not Implemented
UD0784 # 04 Y:2008 04 2008 USE POWER DURING OFF-PEAK PERIODS $19,834 $0 Not Implemented
UD0784 # 05 Y:2008 05 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,298 $4,400 Not Implemented
UD0784 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,375 $24,502 Not Implemented
UD0784 # 07 Y:2008 07 2008 USE RADIANT HEATER FOR SPOT HEATING $14,677 $26,000 Not Implemented
UD0784 # 08 Y:2008 08 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $10,565 $24,000 Not Implemented
UD0784 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,327 $17,943 Not Implemented
UD0784 # 10 Y:2008 10 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,128 $0 Not Implemented
UD0784 # 11 Y:2008 11 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,237 $12,500 Not Implemented
UD0784 # 12 Y:2008 12 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,465 $7,440 Not Implemented
UD0784 # 13 Y:2008 13 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,512 $0 Not Implemented
UD0784 # 14 Y:2008 14 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,907 $0 Not Implemented
UD0784 # 15 Y:2008 15 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,701 $2,000 Not Implemented
UD0784 # 16 Y:2008 16 2008 UPGRADE CONTROLS ON COMPRESSORS $828 $0 Not Implemented
UD0784 # 17 Y:2008 17 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $980 $1,000 Not Implemented