IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0594 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,181 $6,536 Implemented
UF0594 # 09 Y:2023 09 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,390 $4,885 Not Implemented
UF0594 # 04 Y:2023 04 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $15,924 $16,616 Not Implemented
UF0594 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,320 $18,243 Not Implemented
UF0594 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,918 $756 Implemented
UF0594 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,148 $25,265 Not Implemented
UF0594 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $3,393 $1,754 Not Implemented
UF0594 # 03 Y:2023 03 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,069 $9,630 Not Implemented
UF0594 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $87,918 $289,896 Not Implemented
UF0594 # 02 Y:2023 02 2023 RECOVER MECHANICAL ENERGY $19,952 $159 Not Implemented
MI0422 # 05 Y:2023 05 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,579 $4,001 Implemented
MI0422 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $394 $0 Implemented
MI0422 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $109,428 $738,652 Not Implemented
MI0422 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,293 $580 Implemented
MI0422 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $37,264 $20,375 Not Implemented
MI0422 # 04 Y:2023 04 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,309 $280 Implemented
MI0390 # 02 Y:2021 02 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,349 $7,564 Not Implemented
MI0390 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $3,477 Implemented
MI0390 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,273 $1,040 Implemented
MI0390 # 04 Y:2021 04 2021 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,586 $1,120 Not Implemented
UF0531 # 02 Y:2019 02 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $18,581 $89,000 Implemented
UF0531 # 06 Y:2019 06 2019 UPGRADE CONTROLS ON COMPRESSORS $1,675 $667 Implemented
UF0531 # 03 Y:2019 03 2019 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $17,787 $43,500 Implemented
UF0531 # 01 Y:2019 01 2019 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $19,490 $2,150 Implemented
UF0531 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $2,072 $195 Implemented