IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2410 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,308 $1,300 n/a
UC2410 # 08 Y:2024 08 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $185 $0 n/a
UC2410 # 03 Y:2024 03 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $238 $0 n/a
UC2410 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $187 $0 n/a
UC2410 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,516 $0 n/a
UC2410 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,615 $75 n/a
UC2410 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,168 $100 n/a
UC2410 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,791 $3,455 n/a
MA0837 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,956 $500 Implemented
MA0837 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,463 $625 Implemented
MA0837 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,316 $600 Implemented
MA0837 # 03 Y:2022 03 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,507 $46,265 Not Implemented
MA0837 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,317 $2,500 Implemented
MA0837 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,524 $1,250 Implemented
MA0805 # 03 Y:2019 03 2019 USE SOLAR HEAT FOR HEAT $77,280 $383,955 Not Implemented
MA0805 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,775 $200 Implemented
MA0805 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,131 $5,222 Not Implemented
MA0805 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $25,552 $7,916 Not Implemented
MA0805 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,514 $32,800 Implemented
MA0805 # 04 Y:2019 04 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $40,486 $165,914 Not Implemented
MA0805 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,405 $128,486 Implemented
MA0805 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $96,513 $144,000 Not Implemented
MAS024 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $241 $345 Not Implemented
MAS024 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,802 $22,500 Not Implemented
MAS024 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,749 $0 Implemented