IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0350 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,920 $300 Implemented
SF0350 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,274 $1,332 Implemented
SF0350 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $399 $492 Implemented
SF0350 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,126 $2,145 Not Implemented
SF0350 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $644 $4,267 Not Implemented
SF0350 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $9,827 Not Implemented
OK0753 # 07 Y:2007 07 2007 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,437 $13,500 Not Implemented
OK0753 # 08 Y:2007 08 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000 $0 Not Implemented
OK0753 # 05 Y:2007 05 2007 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $387,006 $553,000 Not Implemented
OK0753 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,786 $3,600 Not Implemented
OK0753 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $4,874 $9,950 Not Implemented
OK0753 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,715 $4,795 Not Implemented
OK0753 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,594 $289 Not Implemented
OK0753 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $49,649 $0 Implemented
OK0753 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $4,489 Not Implemented
IC0135 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $2,488 $2,904 Not Implemented
IC0135 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,449 $1,380 Not Implemented
IC0135 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $489 $228 Not Implemented
IC0135 # 09 Y:2007 09 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,210 $4,835 Not Implemented
IC0135 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,093 $11,558 Not Implemented
IC0135 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $945 $0 Not Implemented
IC0135 # 10 Y:2007 10 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,755 $0 Not Implemented
IC0135 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,848 $48,465 Not Implemented
IC0135 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,459 $14,076 Not Implemented
IC0135 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $607 $1,193 Not Implemented