IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0584 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,183 $21,035 Not Implemented
NC0584 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,714 $26,550 Not Implemented
NC0584 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $470 $340 Not Implemented
NC0584 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $13,915 $20,000 Not Implemented
NC0584 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $1,083 $1,785 Not Implemented
NC0584 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $200 Implemented
NC0584 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $959 $3,905 Not Implemented
SU0427 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,703 $34,086 Implemented
SU0427 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $195 $173 Not Implemented
SU0427 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $189 $924 Implemented
SU0427 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $124 $556 Implemented
SU0427 # 03 Y:2016 03 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $240 $484 Not Implemented
SU0427 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $442 $317 Implemented
MA0765 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,576 $1,152 Implemented
MA0765 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,910 $95,901 Not Implemented
MA0765 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $15,004 $12,000 Implemented
MA0765 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $1,080 $900 Implemented
MA0765 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,076 $4,235 Not Implemented
MA0765 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,000 $1,000 Implemented
IA0567 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,956 $7,888 Not Implemented
IA0567 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,409 $75,175 Not Implemented
IA0567 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,535 $1,320 Not Implemented
IA0567 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,604 $8,596 Not Implemented
IA0567 # 05 Y:2016 05 2016 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $1,259 $500 Not Implemented
UD0958 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $89,455 $0 Not Implemented