Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0614 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,910 | $351 | Implemented |
UF0614 # 13 Y:2024 | 13 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $27,969 | $60,000 | Implemented |
UF0614 # 12 Y:2024 | 12 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,444 | $4,280 | Implemented |
UF0614 # 14 Y:2024 | 14 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $5,321 | $3,260 | Implemented |
UF0614 # 10 Y:2024 | 10 | 2024 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,337 | $1,797 | Implemented |
UF0614 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $35,722 | $41,798 | Implemented |
UF0614 # 03 Y:2024 | 03 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $24,631 | $18,563 | Implemented |
UF0614 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,952 | $39,000 | Implemented |
UF0614 # 07 Y:2024 | 07 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,473 | $24,140 | Implemented |
UF0594 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,181 | $6,536 | Implemented |
UF0594 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,918 | $756 | Implemented |
MI0422 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $394 | $0 | Implemented |
MI0422 # 05 Y:2023 | 05 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,579 | $4,001 | Implemented |
MI0422 # 04 Y:2023 | 04 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,309 | $280 | Implemented |
MI0422 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,293 | $580 | Implemented |
MI0390 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $3,477 | Implemented |
MI0390 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,273 | $1,040 | Implemented |
UF0531 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,473 | $7,866 | Implemented |
UF0531 # 06 Y:2019 | 06 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $1,675 | $667 | Implemented |
UF0531 # 03 Y:2019 | 03 | 2019 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $17,787 | $43,500 | Implemented |
UF0531 # 02 Y:2019 | 02 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $18,581 | $89,000 | Implemented |
UF0531 # 01 Y:2019 | 01 | 2019 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $19,490 | $2,150 | Implemented |
UF0531 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $2,072 | $195 | Implemented |
UF0525 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,145 | $3,960 | Implemented |
UF0525 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,245 | $18,331 | Implemented |