IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,797

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0099 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,085 $66,591 Not Implemented
IC0099 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $246 $0 Implemented
IC0099 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,577 $1,200 Implemented
IC0099 # 05 Y:2005 05 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $6,852 $1,520 Implemented
IC0099 # 06 Y:2005 06 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $671 $48 Not Implemented
IC0099 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $92 $364 Not Implemented
IC0099 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $531 $1,121 Not Implemented
UF0360 # 01 Y:2005 01 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,102 $34,362 Implemented
UF0360 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,418 $744 Implemented
UF0360 # 03 Y:2005 03 2005 CLEAN CONDENSER TUBES $2,414 $12,044 Implemented
UF0360 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,698 $8,619 Implemented
UF0360 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $988 $0 Implemented
UF0360 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,405 $0 Not Implemented
UF0360 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,246 $6,221 Implemented
UF0360 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $585 $332 Not Implemented
UF0360 # 09 Y:2005 09 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $0 $0 Implemented
OK0703 # 01 Y:2005 01 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $37,468 $34,300 Not Implemented
OK0703 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,044 $25,020 Implemented
OK0703 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,596 $39,180 Implemented
OK0703 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,659 $1,739 Not Implemented
OK0703 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,204 $1,727 Implemented
OK0703 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,018 $22,540 Implemented
OK0703 # 07 Y:2005 07 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,250 $0 Not Implemented
OK0703 # 08 Y:2005 08 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,564 $1,025 Not Implemented
MS0268 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,099 $44,786 Not Implemented