Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,797
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0680 # 05 Y:2004 | 05 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $3,154 | $590 | Implemented |
OK0680 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,427 | $28,713 | Not Implemented |
OK0680 # 07 Y:2004 | 07 | 2004 | REDUCE FLUID FLOW RATES | $38,434 | $27,594 | Not Implemented |
OK0680 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $945 | $479 | Not Implemented |
OK0680 # 09 Y:2004 | 09 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $9,109 | $36,000 | Not Implemented |
CO0538 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,780 | $13,490 | n/a |
CO0538 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,300 | $170 | Implemented |
CO0538 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,530 | $500 | Implemented |
CO0538 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $536 | $390 | Implemented |
CO0538 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,150 | $2,790 | Implemented |
CO0538 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $548 | $274 | Not Implemented |
CO0538 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $680 | $310 | Not Implemented |
CO0538 # 08 Y:2004 | 08 | 2004 | INSULATE BARE EQUIPMENT | $370 | $250 | Not Implemented |
CO0538 # 09 Y:2004 | 09 | 2004 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,990 | $500 | Implemented |
NC0276 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,019 | $18,000 | Not Implemented |
NC0276 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,986 | $16,406 | Not Implemented |
NC0276 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $18,000 | $8,050 | Implemented |
NC0276 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $14,713 | $3,487 | Not Implemented |
NC0276 # 05 Y:2004 | 05 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,432 | $1,085 | Implemented |
NC0276 # 06 Y:2004 | 06 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,405 | $5,000 | Not Implemented |
NC0276 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,023 | $1,170 | Implemented |
UD0684 # 01 Y:2003 | 01 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $34,560 | $0 | Implemented |
UD0684 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,504 | $37,800 | Not Implemented |
UD0684 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,995 | $29,250 | Not Implemented |
UD0684 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $15,725 | $6,450 | Not Implemented |