Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,786
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0451 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,048 | $1,280 | Not Implemented |
WI0451 # 06 Y:2003 | 06 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,005 | $1,400 | Not Implemented |
WI0451 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $754 | $294 | Not Implemented |
UM0241 # 01 Y:2003 | 01 | 2003 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $573,000 | $390,000 | Not Implemented |
UM0241 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,350 | $8,000 | Implemented |
UM0241 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,900 | $4,800 | Not Implemented |
UM0241 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,270 | $10,510 | Implemented |
UM0241 # 05 Y:2003 | 05 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,275 | $2,100 | Implemented |
UM0241 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $75 | Implemented |
CO0527 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,000 | $15,440 | Not Implemented |
CO0527 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,260 | $550 | Not Implemented |
CO0527 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $467 | $518 | Not Implemented |
CO0527 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $960 | $2,310 | Not Implemented |
CO0527 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $600 | $1,270 | Not Implemented |
WV0271 # 01 Y:2003 | 01 | 2003 | INSULATE BARE EQUIPMENT | $76,401 | $2,253 | Implemented |
WV0271 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $27,875 | $480 | Implemented |
WV0271 # 03 Y:2003 | 03 | 2003 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $36,152 | $180,000 | Not Implemented |
WV0271 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,169 | $500 | Not Implemented |
WV0271 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,764 | $128 | Implemented |
WV0271 # 06 Y:2003 | 06 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,697 | $32 | Not Implemented |
WV0271 # 07 Y:2003 | 07 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,967 | $1,741 | Not Implemented |
WV0271 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,612 | $800 | Not Implemented |
WV0271 # 09 Y:2003 | 09 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,425 | $250 | Implemented |
WV0271 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,758 | $0 | Implemented |
WV0271 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $839 | $800 | Implemented |