Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,797
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2311 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,574 | $6,440 | Implemented |
KS2311 # 02 Y:2023 | 02 | 2023 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $19,596 | $10,708 | Not Implemented |
KS2311 # 03 Y:2023 | 03 | 2023 | INSULATE FEEDWATER TANK | $4,841 | $4,104 | Not Implemented |
KS2311 # 04 Y:2023 | 04 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,819 | $3,753 | Not Implemented |
KS2311 # 05 Y:2023 | 05 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,129 | $0 | Not Implemented |
KS2311 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $66,324 | $627,000 | Not Implemented |
KS2311 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,047 | $422,421 | Not Implemented |
SD0627 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $634 | $2,128 | Not Implemented |
SD0627 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,041 | $48,250 | Not Implemented |
SD0627 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,383 | $164,701 | Not Implemented |
SD0627 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,584 | $7,660 | Not Implemented |
SD0627 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,101 | $9,714 | Not Implemented |
SD0627 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,072 | $2,788 | Not Implemented |
SD0627 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $776 | $1,200 | Not Implemented |
SD0627 # 08 Y:2023 | 08 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,281 | $41,842 | Not Implemented |
SD0627 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,599 | $327,726 | Not Implemented |
TT0287 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,724 | $60 | n/a |
TT0287 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,633 | $1,785 | n/a |
TT0287 # 03 Y:2023 | 03 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,858 | $7,500 | n/a |
TT0287 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,231 | $3,100 | n/a |
TT0287 # 05 Y:2023 | 05 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,905 | $1,050 | n/a |
TT0287 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,202 | $21,100 | n/a |
TT0287 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,887 | $113 | n/a |
TT0287 # 08 Y:2023 | 08 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,558 | $3,750 | n/a |
TT0287 # 09 Y:2023 | 09 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,170 | $7,500 | n/a |