Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
223
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0352 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,107 | $10,200 | Not Implemented |
SD0352 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,672 | $0 | Not Implemented |
SD0352 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $820,692 | $1,776,190 | n/a |
MA0564 # 01 Y:2004 | 01 | 2004 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $20,000 | $0 | Not Implemented |
MA0564 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,419 | $10,531 | Not Implemented |
MA0564 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,406 | $3,226 | Not Implemented |
MA0564 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $122 | $548 | Implemented |
MA0564 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $168 | $75 | Not Implemented |
TA0081 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,360 | $0 | Implemented |
TA0081 # 04 Y:2004 | 04 | 2004 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $11,120 | $2,795 | Not Implemented |
TA0081 # 06 Y:2004 | 06 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,255 | $190 | Not Implemented |
TA0081 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $40 | Implemented |
TA0081 # 07 Y:2004 | 07 | 2004 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,035 | $0 | Implemented |
TA0081 # 08 Y:2004 | 08 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,880 | $0 | Not Implemented |
TA0081 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,775 | $0 | Implemented |
TA0081 # 01 Y:2004 | 01 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,080 | $31,600 | Not Implemented |
UM0264 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,250 | $2,600 | Implemented |
UM0264 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,340 | $12,530 | n/a |
UM0264 # 03 Y:2004 | 03 | 2004 | $7,700 | $800 | Not Implemented | |
UM0264 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $1,281 | $509 | Not Implemented |
UM0264 # 08 Y:2004 | 08 | 2004 | COVER OPEN TANKS | $379 | $500 | Not Implemented |
UM0264 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,653 | $9,433 | Not Implemented |
UM0264 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,670 | $500 | Not Implemented |
UM0264 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $312 | $200 | Not Implemented |
UM0264 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $2,270 | $5,610 | Not Implemented |