Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0531 # 03 Y:2019 03 2019 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $17,787 $43,500 Implemented
UF0531 # 02 Y:2019 02 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $18,581 $89,000 Implemented
UF0531 # 01 Y:2019 01 2019 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $19,490 $2,150 Implemented
UF0525 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,500 $33,800 Not Implemented
UF0525 # 09 Y:2019 09 2019 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $34,636 $10,000 Not Implemented
UF0525 # 08 Y:2019 08 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $35,380 $15,216 Not Implemented
UF0525 # 07 Y:2019 07 2019 ISOLATE HOT OR COLD EQUIPMENT $1,061 $2,108 Not Implemented
UF0525 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,312 $464 Implemented
UF0525 # 05 Y:2019 05 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,145 $3,960 Implemented
UF0525 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,084 $4,798 Implemented
UF0525 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,245 $18,331 Implemented
UF0525 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,580 $31,585 Implemented
UF0524 # 09 Y:2019 09 2019 TREAT AND REUSE RINSE WATERS $17,615 $0 Implemented
UF0524 # 08 Y:2019 08 2019 ISOLATE HOT OR COLD EQUIPMENT $4,945 $5,090 Not Implemented
UF0524 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,897 $0 Implemented
UF0524 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,978 $400 Implemented
UF0524 # 05 Y:2019 05 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $19,167 $89,865 Not Implemented
UF0524 # 04 Y:2019 04 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $22,663 $18,928 Not Implemented
UF0524 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,330 $139,780 Implemented
UF0524 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $212,420 $75,000 Not Implemented
UF0524 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $371,464 $1,750,000 Not Implemented
MI0323 # 06 Y:2017 06 2017 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,290 $7,150 Implemented
MI0323 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,380 $1,660 Implemented
MI0323 # 08 Y:2017 08 2017 USE SOLAR HEAT TO HEAT WATER $1,635 $1,500 Implemented
MI0323 # 05 Y:2017 05 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,024 $26,400 Not Implemented