Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
367
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0523 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,883 | $11,174 | Implemented |
SD0523 # 02 Y:2016 | 02 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,463 | $69,877 | Implemented |
SD0523 # 01 Y:2016 | 01 | 2016 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $38,152 | $147,781 | Implemented |
SD0521 # 10 Y:2016 | 10 | 2016 | INSULATE BARE EQUIPMENT | $566 | $203 | Not Implemented |
SD0521 # 09 Y:2016 | 09 | 2016 | INSTALL SKYLIGHTS | $1,418 | $3,648 | Not Implemented |
SD0521 # 08 Y:2016 | 08 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,279 | $1,300 | Not Implemented |
SD0521 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,421 | $3,450 | Not Implemented |
SD0521 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,938 | $800 | Not Implemented |
SD0521 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,749 | $1,000 | Not Implemented |
SD0521 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $8,590 | $4,950 | Not Implemented |
SD0521 # 03 Y:2016 | 03 | 2016 | RECOVER AND REUSE WASTE MATERIAL | $11,486 | $5,500 | Not Implemented |
SD0521 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,324 | $35,903 | Not Implemented |
SD0521 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $63,923 | $80,120 | Not Implemented |
SD0516 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $797 | $1,500 | Implemented |
SD0516 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,238 | $200 | Implemented |
SD0516 # 04 Y:2015 | 04 | 2015 | USE PHOTOCELL CONTROLS | $1,539 | $1,295 | Implemented |
SD0516 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $2,406 | $2,370 | Not Implemented |
SD0516 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,584 | $3,900 | Implemented |
SD0516 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $21,830 | $48,900 | Implemented |
SF0465 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,965 | $3,081 | Not Implemented |
SF0465 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,736 | $26,646 | Implemented |
SF0465 # 04 Y:2015 | 04 | 2015 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $914 | $1,510 | Not Implemented |
SF0465 # 02 Y:2015 | 02 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $1,344 | $648 | Implemented |
SF0465 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,904 | $0 | Not Implemented |
SD0478 # 05 Y:2014 | 05 | 2014 | USE PHOTOCELL CONTROLS | $2,220 | $4,625 | Implemented |