IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,797

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0470 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,569 $600 Not Implemented
SD0470 # 07 Y:2013 07 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,245 $9,125 Not Implemented
SD0470 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,241 $2,390 Not Implemented
UA0101 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $16,195 $150 Implemented
UA0101 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,664 $7,400 Not Implemented
UA0101 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,670 $80 Implemented
UA0101 # 04 Y:2013 04 2013 MINIMIZE WATER USAGE $20,266 $8,192 Not Implemented
UA0101 # 05 Y:2013 05 2013 USE PHOTOCELL CONTROLS $580 $251 Implemented
UA0101 # 06 Y:2013 06 2013 REPLACE BOILER $14,175 $112,000 Not Implemented
SU0340 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,153 $0 Implemented
SU0340 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $1,696 $1,150 Implemented
SU0340 # 03 Y:2013 03 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $60 $202 Not Implemented
SU0340 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,813 $15,885 Implemented
WV0465 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,796 $52,900 Implemented
WV0465 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,591 $44,160 Implemented
WV0465 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,229 $16,800 Implemented
WV0465 # 04 Y:2013 04 2013 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,400 $6,350 Not Implemented
WV0465 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,786 $1,000 Implemented
WV0465 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,638 $1,083 Not Implemented
WV0465 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,174 $3,762 Implemented
WV0465 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $1,171 $816 Implemented
WV0465 # 09 Y:2013 09 2013 DEVELOP A REPAIR/REPLACE POLICY $174 $415 Implemented
WV0465 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $155 $90 Implemented
MZ0103 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $18,508 $10,648 Not Implemented
MZ0103 # 02 Y:2013 02 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,181 $14,224 Not Implemented