IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,797

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0595 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $2,300 $200 Implemented
AM0595 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,130 $1,380 Implemented
AM0595 # 08 Y:2011 08 2011 USE SYNTHETIC LUBRICANT $1,830 $0 Implemented
AM0595 # 09 Y:2011 09 2011 PAY UTILITY BILLS ON TIME $229 $0 Implemented
NC0423 # 01 Y:2011 01 2011 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $1,468,749 $650,000 Implemented
NC0423 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,736 $100 Implemented
NC0423 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $26,211 $60,000 Not Implemented
NC0423 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $24,869 $42,000 Not Implemented
NC0423 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $86,720 $87,892 Not Implemented
NC0423 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,209 $115,608 Implemented
NC0423 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,230 $4,585 Implemented
NC0423 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $4,313 $12,378 Not Implemented
SD0503 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,987 $2,250 Implemented
SD0503 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,203 $56,758 Implemented
SD0503 # 03 Y:2010 03 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,981 $0 Implemented
SD0503 # 04 Y:2010 04 2010 INSTALL SKYLIGHTS $7,467 $22,980 Implemented
SF0390 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,708 $0 Implemented
SF0390 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,828 $0 Implemented
SF0390 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $14,706 $3,207 Implemented
SF0390 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,023 $1,764 Implemented
SF0390 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $24,404 $7,250 Implemented
SF0390 # 06 Y:2010 06 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,991 $789 Implemented
SF0390 # 07 Y:2010 07 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,024 $5,560 Implemented
SF0390 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $4,611 $2,176 Not Implemented
SF0390 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $326 $261 Not Implemented