Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
99
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0347 # 06 Y:2008 | 06 | 2008 | INSTALL AUTOMATIC STACK DAMPER | $29,890 | $8,100 | Not Implemented |
UM0347 # 04 Y:2008 | 04 | 2008 | INSTALL OCCUPANCY SENSORS | $1,503 | $500 | Not Implemented |
UM0347 # 03 Y:2008 | 03 | 2008 | COVER OPEN TANKS | $2,233 | $1,046 | Not Implemented |
UM0347 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,545 | $6,240 | Not Implemented |
UM0347 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $452 | $422 | Not Implemented |
UM0347 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,638 | $8,898 | Not Implemented |
DL0025 # 06 Y:2008 | 06 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $3,964 | $0 | Not Implemented |
DL0025 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,919 | $30,000 | Implemented |
DL0025 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,600 | $0 | Not Implemented |
DL0025 # 03 Y:2008 | 03 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $36,900 | $0 | Implemented |
DL0025 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,976 | $0 | Implemented |
DL0025 # 01 Y:2008 | 01 | 2008 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $1,078 | $0 | Not Implemented |
SD0410 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,041 | $5,849 | Not Implemented |
SD0410 # 11 Y:2008 | 11 | 2008 | INSTALL SKYLIGHTS | $7,467 | $22,980 | Implemented |
SD0410 # 07 Y:2008 | 07 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $22,978 | $11,522 | Not Implemented |
SD0410 # 12 Y:2008 | 12 | 2008 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,185 | $0 | Not Implemented |
SD0410 # 08 Y:2008 | 08 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,624 | $24,471 | Not Implemented |
SD0410 # 09 Y:2008 | 09 | 2008 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $10,867 | $500 | Not Implemented |
SD0410 # 01 Y:2008 | 01 | 2008 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $824,374 | $6,360,000 | Not Implemented |
SD0410 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,992 | $2,250 | Implemented |
SD0410 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $41,267 | $0 | Not Implemented |
SD0410 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,826 | $81,570 | Not Implemented |
SD0410 # 04 Y:2008 | 04 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $28,203 | $56,758 | Implemented |
SD0410 # 06 Y:2008 | 06 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $24,980 | $0 | Implemented |
IC0144 # 05 Y:2008 | 05 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $68 | $0 | Implemented |