IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 3262 Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0060 # 10 Y:2024 10 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $42,322 $490,355 Implemented
MU0060 # 09 Y:2024 09 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,407 $66,000 Not Implemented
MU0060 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,220 $5,000 Not Implemented
MU0060 # 07 Y:2024 07 2024 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $1,733 $5,000 Not Implemented
MU0060 # 06 Y:2024 06 2024 USE AUTOMATIC CLEANING EQUIPMENT $44,873 $110,000 Not Implemented
MU0060 # 05 Y:2024 05 2024 UPGRADE OBSOLETE EQUIPMENT $76,249 $151,800 Not Implemented
MU0060 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,778 $24,085 Not Implemented
MU0060 # 03 Y:2024 03 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,517 $1,184 Not Implemented
MU0060 # 02 Y:2024 02 2024 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $126,131 $8,400 Not Implemented
MU0060 # 01 Y:2024 01 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $328 $0 Not Implemented
MU0012 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,977 $0 Not Implemented
MU0012 # 12 Y:2022 12 2022 USE OPTIMUM TEMPERATURE $42 $0 Not Implemented
MU0012 # 11 Y:2022 11 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $95 $0 Not Implemented
MU0012 # 10 Y:2022 10 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $132 $0 Not Implemented
MU0012 # 09 Y:2022 09 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $158 $99 Not Implemented
MU0012 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $344 $80 Not Implemented
MU0012 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $425 Implemented
MU0012 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $415 $485 Not Implemented
MU0012 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $453 $124 Not Implemented
MU0012 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $543 $313 Not Implemented
MU0012 # 03 Y:2022 03 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $711 $90 Not Implemented
MU0012 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $25,256 $31 Implemented
IC0204 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $36,108 $187,206 Implemented
IC0204 # 03 Y:2018 03 2018 REPLACE BOILER $97,199 $211,342 Implemented
IC0204 # 02 Y:2018 02 2018 ADJUST PH FOR NEUTRALIZATION $132,488 $180,000 Implemented