Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
144
matching recommendationsNAICS | 3262 | Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0101 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $290 | $360 | Implemented |
MZ0101 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,340 | $8,800 | Implemented |
MZ0101 # 02 Y:2012 | 02 | 2012 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $934 | $4,969 | Not Implemented |
MZ0101 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,105 | $1,160 | Implemented |
MZ0101 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $199 | $297 | Implemented |
LE0350 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $5,076 | $1,275 | Implemented |
LE0350 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $634 | $0 | Implemented |
LE0350 # 10 Y:2012 | 10 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21 | $0 | Implemented |
LE0350 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,490 | $1,000 | Implemented |
LE0350 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,053 | $600 | Not Implemented |
LE0350 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,329 | $8,800 | Not Implemented |
LE0350 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,117 | $2,783 | Not Implemented |
LE0350 # 14 Y:2012 | 14 | 2012 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $57 | $0 | Implemented |
LE0350 # 13 Y:2012 | 13 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,986 | $3,000 | Not Implemented |
LE0350 # 12 Y:2012 | 12 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,008 | $2,000 | Implemented |
LE0350 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,486 | $11,638 | Not Implemented |
LE0350 # 04 Y:2012 | 04 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,994 | $15,500 | Not Implemented |
LE0350 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $5,254 | $9,913 | Not Implemented |
LE0350 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,189 | $3,025 | Not Implemented |
SD0456 # 01 Y:2012 | 01 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $48,105 | $79,350 | Not Implemented |
SD0456 # 04 Y:2012 | 04 | 2012 | USE PHOTOCELL CONTROLS | $5,372 | $4,900 | Not Implemented |
SD0456 # 06 Y:2012 | 06 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,322 | $7,503 | Implemented |
SD0456 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,264 | $10,398 | Implemented |
SD0456 # 05 Y:2012 | 05 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,297 | $500 | Implemented |
SD0456 # 02 Y:2012 | 02 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,534 | $2,700 | Implemented |