IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 32621 Tire Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0085 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349,571 $177,363 Not Implemented
UA0085 # 08 Y:2012 08 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $48,968 $131,587 Not Implemented
UA0085 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $58,443 $1,920 Implemented
UA0085 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $146,229 $68,100 Not Implemented
UA0085 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $151,364 $35,390 Implemented
UA0085 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,936 $7,682 Not Implemented
UA0085 # 03 Y:2012 03 2012 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $86,957 $214,808 Not Implemented
UA0085 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $164,656 $57,024 Implemented
UA0085 # 01 Y:2012 01 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $6,264,801 $14,443,176 Not Implemented
UA0085 # 10 Y:2012 10 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $529,960 $400,000 Not Implemented
MZ0084 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,142 $1,000 Not Implemented
MZ0084 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,602 $15,200 Implemented
MZ0084 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $3,500 Implemented
MZ0084 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,987 $500 Not Implemented
MZ0084 # 04 Y:2012 04 2012 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,897 $2,400 Not Implemented
MZ0084 # 05 Y:2012 05 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,831 $37,520 Not Implemented
MZ0084 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,736 $11,730 Implemented
MZ0084 # 08 Y:2012 08 2012 ELIMINATE/REDUCE AN OPERATION $6,939 $0 Implemented
MZ0084 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $1,483 $2,500 Implemented
MZ0084 # 10 Y:2012 10 2012 OPERATE BOILERS ON HIGH FIRE SETTING $10,918 $1,770 Implemented
SU0318 # 06 Y:2012 06 2012 REDUCE VENTILATION AIR $3,491 $4,419 Not Implemented
SU0318 # 05 Y:2012 05 2012 ELIMINATE/REDUCE AN OPERATION $12,250 $11,115 Not Implemented
SU0318 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $106,547 $32,436 Implemented
SU0318 # 03 Y:2012 03 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $72 $0 Implemented
SU0318 # 02 Y:2012 02 2012 USE SYNTHETIC LUBRICANT $7,917 $0 Implemented