IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 326211 Tire Manufacturing (except Retreading)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0325 # 11 Y:2025 11 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $718 $2,640 n/a
TT0325 # 10 Y:2025 10 2025 METER WASTE WATER $1,047 $1,100 n/a
TT0325 # 09 Y:2025 09 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,955 $1,000 n/a
TT0325 # 01 Y:2025 01 2025 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $242,348 $1,045,217 n/a
TT0325 # 02 Y:2025 02 2025 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $68,822 $200,000 n/a
TT0325 # 03 Y:2025 03 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $30,978 $17,480 n/a
TT0325 # 04 Y:2025 04 2025 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,824 $22,500 n/a
TT0325 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,974 $16,000 n/a
TT0325 # 06 Y:2025 06 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $5,854 $400 n/a
TT0325 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,049 $30,040 n/a
TT0325 # 08 Y:2025 08 2025 INSTALL OCCUPANCY SENSORS $4,068 $15,000 n/a
UA0112 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,143 $520 Not Implemented
UA0112 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,965 $49,792 Not Implemented
UA0112 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,177 $878 Implemented
UA0112 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,385 $2,330 Implemented
UA0112 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,737 $19,304 Not Implemented
UA0085 # 10 Y:2012 10 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $529,960 $400,000 Not Implemented
UA0085 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349,571 $177,363 Not Implemented
UA0085 # 01 Y:2012 01 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $6,264,801 $14,443,176 Not Implemented
UA0085 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $164,656 $57,024 Implemented
UA0085 # 03 Y:2012 03 2012 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $86,957 $214,808 Not Implemented
UA0085 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,936 $7,682 Not Implemented
UA0085 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $151,364 $35,390 Implemented
UA0085 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $146,229 $68,100 Not Implemented
UA0085 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $58,443 $1,920 Implemented