Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
269
matching recommendationsNAICS | 32622 | Rubber and Plastics Hoses and Belting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0501 # 01 Y:2013 | 01 | 2013 | AIR CONDITION ONLY SPACE NECESSARY | $4,234 | $2,800 | Implemented |
IA0501 # 02 Y:2013 | 02 | 2013 | ISOLATE HOT OR COLD EQUIPMENT | $705 | $840 | Not Implemented |
IA0501 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $819 | $2,680 | Implemented |
IA0501 # 04 Y:2013 | 04 | 2013 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $486 | $334 | Not Implemented |
IA0501 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,018 | $22,500 | Not Implemented |
IA0501 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,728 | $2,575 | Not Implemented |
IA0501 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,367 | $1,800 | Implemented |
IA0501 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,771 | $650 | Not Implemented |
IA0501 # 09 Y:2013 | 09 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,349 | $1,200 | Not Implemented |
MZ0101 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,105 | $1,160 | Implemented |
MZ0101 # 02 Y:2012 | 02 | 2012 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $934 | $4,969 | Not Implemented |
MZ0101 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,340 | $8,800 | Implemented |
MZ0101 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $199 | $297 | Implemented |
MZ0101 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $290 | $360 | Implemented |
TT0086 # 01 Y:2012 | 01 | 2012 | USE OPTIMUM THICKNESS INSULATION | $920 | $950 | Implemented |
TT0086 # 02 Y:2012 | 02 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,061 | $0 | Implemented |
TT0086 # 03 Y:2012 | 03 | 2012 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $3,238 | $7,500 | Not Implemented |
TT0086 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,266 | $3,000 | Implemented |
TT0086 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,497 | $9,219 | Implemented |
MA0682 # 01 Y:2011 | 01 | 2011 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $29,366 | $91,950 | Not Implemented |
MA0682 # 02 Y:2011 | 02 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,038 | $57,600 | Not Implemented |
MA0682 # 03 Y:2011 | 03 | 2011 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,594 | $0 | Implemented |
MA0682 # 04 Y:2011 | 04 | 2011 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $10,708 | $29,760 | Implemented |
MA0682 # 05 Y:2011 | 05 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,468 | $7,325 | Implemented |
MZ0036 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,757 | $26,855 | Implemented |