Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 326220 | Rubber and Plastics Hoses and Belting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0082 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $866 | $0 | Implemented |
IP0082 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $86 | $0 | Implemented |
IP0082 # 13 Y:2017 | 13 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $169 | $627 | Not Implemented |
IP0082 # 12 Y:2017 | 12 | 2017 | OPTIMIZE PLANT POWER FACTOR | $7,316 | $21,686 | Implemented |
IP0082 # 11 Y:2017 | 11 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,464 | $9,078 | Not Implemented |
IP0082 # 10 Y:2017 | 10 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $134 | $270 | Implemented |
IP0082 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,194 | $19,486 | Implemented |
IP0082 # 08 Y:2017 | 08 | 2017 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $31,824 | $38,940 | Not Implemented |
IP0082 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $3,769 | $3,724 | Implemented |
IP0082 # 06 Y:2017 | 06 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,541 | $1,698 | Not Implemented |
IP0082 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $24,829 | $2,670 | Implemented |
IP0082 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,933 | $3 | Not Implemented |
IP0082 # 03 Y:2017 | 03 | 2017 | PAY BILLS ON TIME TO AVOID LATE FEES | $828 | $0 | Implemented |
UD0723 # 15 Y:2005 | 15 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $522 | $0 | Implemented |
UD0723 # 14 Y:2005 | 14 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $840 | $0 | Not Implemented |
UD0723 # 13 Y:2005 | 13 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,423 | $500 | Not Implemented |
UD0723 # 12 Y:2005 | 12 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,164 | $0 | Implemented |
UD0723 # 11 Y:2005 | 11 | 2005 | INSULATE BARE EQUIPMENT | $2,650 | $2,629 | Implemented |
UD0723 # 10 Y:2005 | 10 | 2005 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,730 | $0 | Not Implemented |
UD0723 # 09 Y:2005 | 09 | 2005 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $3,070 | $2,000 | Not Implemented |
UD0723 # 08 Y:2005 | 08 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,309 | $0 | Implemented |
UD0723 # 07 Y:2005 | 07 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,573 | $0 | Implemented |
UD0723 # 06 Y:2005 | 06 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,470 | $0 | Not Implemented |
UD0723 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,126 | $7,000 | Implemented |
UD0723 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,315 | $13,340 | Implemented |