IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 326220 Rubber and Plastics Hoses and Belting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0546 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $216 $50 Not Implemented
WV0546 # 11 Y:2017 11 2017 INSULATE BARE EQUIPMENT $239 $342 Implemented
WV0546 # 10 Y:2017 10 2017 MINIMIZE WATER USAGE $393 $1,750 Not Implemented
WV0546 # 09 Y:2017 09 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,670 $1,100 Implemented
WV0546 # 08 Y:2017 08 2017 DEVELOP A REPAIR/REPLACE POLICY $1,672 $600 Implemented
WV0546 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,898 $0 Implemented
WV0546 # 06 Y:2017 06 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,152 $6,100 Implemented
WV0546 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,190 $854 Not Implemented
WV0546 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $4,595 Implemented
WV0546 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,180 $11,575 Implemented
WV0546 # 02 Y:2017 02 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,220 $1,000 Not Implemented
WV0546 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,125 $26,267 Implemented
IP0082 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $866 $0 Implemented
IP0082 # 11 Y:2017 11 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,464 $9,078 Not Implemented
IP0082 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $86 $0 Implemented
IP0082 # 03 Y:2017 03 2017 PAY BILLS ON TIME TO AVOID LATE FEES $828 $0 Implemented
IP0082 # 04 Y:2017 04 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,933 $3 Not Implemented
IP0082 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $24,829 $2,670 Implemented
IP0082 # 06 Y:2017 06 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,541 $1,698 Not Implemented
IP0082 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $3,769 $3,724 Implemented
IP0082 # 08 Y:2017 08 2017 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $31,824 $38,940 Not Implemented
IP0082 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,194 $19,486 Implemented
IP0082 # 10 Y:2017 10 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $134 $270 Implemented
IP0082 # 12 Y:2017 12 2017 OPTIMIZE PLANT POWER FACTOR $7,316 $21,686 Implemented
IP0082 # 13 Y:2017 13 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $627 Not Implemented