IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

889

matching recommendations
Reset
NAICS 32629 Other Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2402 # 08 Y:2024 08 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,934 $155 n/a
UC2402 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $419 $1,300 n/a
UC2402 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,612 $30 n/a
UC2402 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,261 $150 n/a
UC2402 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,943 $1,040 n/a
UC2402 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $1,298 $3,327 n/a
UC2402 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $7,849 $31,027 n/a
UC2402 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $17,049 $134,289 n/a
UD1072 # 07 Y:2024 07 2024 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $14,674 $67,830 Not Implemented
UD1072 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,343 $1,667 Not Implemented
UD1072 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,892 $12,650 Implemented
UD1072 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,454 $952 Not Implemented
UD1072 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $63 $216 Implemented
UD1072 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,199 $864 Implemented
UD1072 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,741 $5,000 Implemented
UF0602 # 10 Y:2023 10 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $215,016 $0 Implemented
UF0602 # 09 Y:2023 09 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $341,860 $20,000 Implemented
UF0602 # 08 Y:2023 08 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,084 $4,788 Implemented
UF0602 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26,608 $0 Implemented
UF0602 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,743 $322,608 Not Implemented
UF0602 # 05 Y:2023 05 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $117,532 $250,000 Not Implemented
UF0602 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $268,820 $137,250 Implemented
UF0602 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339,285 $786,250 Implemented
UF0602 # 02 Y:2023 02 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $389,519 $50,482 Implemented
UF0602 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $848,231 $3,118,500 Not Implemented