Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 32629 | Other Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1061 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $916 | $3,000 | Not Implemented |
OK1061 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,272 | $10,969 | Not Implemented |
OK1061 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $995 | $0 | Not Implemented |
OK1061 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,581 | $11,349 | Not Implemented |
OK0685 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $265,308 | $559,374 | Implemented |
OK0685 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,698 | $1,250 | Not Implemented |
OK0685 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,053 | $2,023 | Implemented |
OK0685 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $11,632 | $6,246 | Not Implemented |
OK0685 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $9,972 | $3,312 | Implemented |
OK0685 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $23,175 | $1,573 | Implemented |
OK0685 # 02 Y:2004 | 02 | 2004 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $10,694 | $34,154 | Implemented |
OK0658 # 01 Y:2003 | 01 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $51,704 | $45,000 | Implemented |
OK0658 # 10 Y:2003 | 10 | 2003 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $7,445 | $0 | Not Implemented |
OK0658 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $6,270 | $2,004 | Implemented |
OK0658 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,609 | $30,876 | Implemented |
OK0658 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,028 | $117 | Not Implemented |
OK0658 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $30,454 | $60,000 | Not Implemented |
OK0658 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,150 | $5,273 | Implemented |
OK0658 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,978 | $367 | Implemented |
OK0658 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,031 | $0 | Implemented |
OK0658 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,266 | $0 | Not Implemented |