Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 32629 | Other Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0751 # 09 Y:2006 | 09 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,062 | $12,000 | Not Implemented |
UD0751 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $21,149 | $61,500 | Not Implemented |
UD0751 # 03 Y:2006 | 03 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $32,112 | $0 | Not Implemented |
UD0751 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $63,687 | $0 | Implemented |
UD0751 # 01 Y:2006 | 01 | 2006 | REDUCE EXCESS STEAM BLEEDING | $90,000 | $18,000 | Not Implemented |
UD0751 # 05 Y:2006 | 05 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $13,248 | $10,000 | Not Implemented |
UD0751 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,066 | $28,800 | Not Implemented |
UD0751 # 07 Y:2006 | 07 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,000 | $0 | Not Implemented |
UD0751 # 08 Y:2006 | 08 | 2006 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $8,395 | $2,000 | Not Implemented |
UD0751 # 10 Y:2006 | 10 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,759 | $5,000 | Implemented |
TA0118 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,339 | $2,016 | Implemented |
TA0118 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $350 | $0 | Implemented |
TA0118 # 05 Y:2006 | 05 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $520 | $0 | Implemented |
TA0118 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,049 | $90 | Implemented |
TA0118 # 03 Y:2006 | 03 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $141 | $141 | Not Implemented |
TA0118 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,842 | $2,000 | Implemented |
WI0513 # 02 Y:2006 | 02 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $16,286 | $2,450 | Not Implemented |
WI0513 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $42,840 | $1,800 | Implemented |
WI0513 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,175 | $1,000 | Not Implemented |
WI0513 # 08 Y:2006 | 08 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,291 | $400 | Implemented |
WI0513 # 09 Y:2006 | 09 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,277 | $200 | Implemented |
WI0513 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,710 | $5,940 | Implemented |
WI0513 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,987 | $450 | Not Implemented |
WI0513 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,529 | $0 | Implemented |
WI0513 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,821 | $640 | Not Implemented |