IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 32629 Other Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2211 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $15,000 Not Implemented
UL2211 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,806 $20,000 Not Implemented
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 06 Y:2022 06 2022 USE SOLAR HEAT TO HEAT WATER $60,938 $150,000 Not Implemented
UL2211 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $96,458 $783,531 Not Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
MU0012 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $543 $313 Not Implemented
MU0012 # 12 Y:2022 12 2022 USE OPTIMUM TEMPERATURE $42 $0 Not Implemented
MU0012 # 11 Y:2022 11 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $95 $0 Not Implemented
MU0012 # 10 Y:2022 10 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $132 $0 Not Implemented
MU0012 # 09 Y:2022 09 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $158 $99 Not Implemented
MU0012 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $344 $80 Not Implemented
MU0012 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $425 Implemented
MU0012 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $415 $485 Not Implemented
MU0012 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $453 $124 Not Implemented
MU0012 # 03 Y:2022 03 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $711 $90 Not Implemented
MU0012 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,977 $0 Not Implemented
MU0012 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $25,256 $31 Implemented
AM0853 # 09 Y:2022 09 2022 USE SYNTHETIC LUBRICANT $830 $500 Implemented
AM0853 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,170 $345 Implemented
AM0853 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $2,537 $2,030 Not Implemented
AM0853 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,715 $500 Implemented
AM0853 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,530 $13,140 Implemented
AM0853 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,040 $19,415 Not Implemented