IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

434

matching recommendations
Reset
NAICS 326291 Rubber Product Manufacturing for Mechanical Use
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0065 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,093 $64,540 Not Implemented
WM0065 # 02 Y:2015 02 2015 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $14,101 $7,500 Not Implemented
WM0065 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,202 $22,500 Not Implemented
WM0065 # 04 Y:2015 04 2015 USE SYNTHETIC LUBRICANT $7,132 $2,146 Not Implemented
WM0065 # 05 Y:2015 05 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $2,778 $426 Not Implemented
WM0065 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,598 $6,000 Not Implemented
WM0065 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,310 $588 Not Implemented
WM0065 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $905 $160 Not Implemented
WM0065 # 09 Y:2015 09 2015 USE PHOTOCELL CONTROLS $465 $1,035 Not Implemented
WM0065 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $304 $536 Not Implemented
UD0896 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $74 $0 Implemented
UD0896 # 02 Y:2014 02 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $31,308 $10,500 Not Implemented
UD0896 # 03 Y:2014 03 2014 MINIMIZE WATER USAGE $7,067 $8,000 Not Implemented
UD0896 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $500 Not Implemented
UD0896 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22 $0 Not Implemented
UD0896 # 06 Y:2014 06 2014 OPTIMIZE PLANT POWER FACTOR $9,728 $8,000 Not Implemented
UD0896 # 07 Y:2014 07 2014 USE OPTIMUM THICKNESS INSULATION $1,035 $1,211 Not Implemented
UD0896 # 08 Y:2014 08 2014 USE RADIANT HEATER FOR SPOT HEATING $794 $1,000 Not Implemented
WV0477 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $3,015 $2,013 Implemented
WV0477 # 02 Y:2013 02 2013 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,823 $6,345 Not Implemented
WV0477 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,064 $3,573 Not Implemented
WV0477 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,996 $1,000 Not Implemented
WV0477 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $1,581 Not Implemented
WV0477 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $595 $257 Implemented
WV0477 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $490 $1,035 Implemented