IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

492

matching recommendations
Reset
NAICS 326299 All Other Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0859 # 07 Y:2012 07 2012 REDUCE EXCESS STEAM BLEEDING $20,148 $0 Implemented
UD0859 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,768 $2,000 Implemented
UD0859 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,869 $10,000 Not Implemented
UD0859 # 10 Y:2012 10 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $4,657 $5,000 Not Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
NC0451 # 04 Y:2012 04 2012 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,656 $1,800 Not Implemented
NC0451 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,516 $4,075 Implemented
NC0451 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $100 Implemented
UD0853 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,419 $28,511 Not Implemented
UD0853 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $3,815 Not Implemented
UD0853 # 03 Y:2012 03 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $15,738 $600 Not Implemented
UD0853 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,192 $5,500 Not Implemented
UD0853 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $6,272 $6,000 Not Implemented
UD0853 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,059 $7,000 Not Implemented
UD0853 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,012 $1,000 Not Implemented
UD0853 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,506 $1,000 Not Implemented
UD0853 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $974 $2,000 Not Implemented
UD0853 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $1,300 Not Implemented
UD0853 # 11 Y:2012 11 2012 COVER OPEN TANKS $4,120 $200 Not Implemented
UD0853 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,076 $9,000 Not Implemented
SD0447 # 01 Y:2012 01 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,132 $320 Not Implemented
SD0447 # 02 Y:2012 02 2012 INSTALL SKYLIGHTS $14,679 $13,457 Not Implemented
SD0447 # 03 Y:2012 03 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,656 $38,885 Not Implemented